Week ahead: Dec. 11-15

1 more week and the end of S1 is here.  Hard to believe half the year has come and gone so quickly.  Thank you all for the fantastic work you have done with kids.  It is a privilege to get to work with you all – and our students are so, so lucky!

So enjoy this last week of S1 – it’s going to be a great final week!

Here is what’s up next week:

Monday, Dec. 11
Day 6, GHEF (Adv)
*Dr. Moran here on campus
1:30-3 Admin Team Mtg

Tuesday, Dec. 12
Day 7, DABC (DEAR)
8:15 Gr 8 Learning Plan mtg

Wednesday, Dec. 13
Day 8, HEFG (DEAR)
1:30-2:30 HOS/MS Principal mtg

Thursday, Dec. 14
Day 9, ABCD (Adv)
8:15-9:15 Principal Coffee (Topic: Teens and Social Media)
6-7:30ish Gr 8 Drama Production (new date)

Friday, Dec. 15
*Breakfast Club sponsored by ALL
Special Schedule

  • 8-8:05  Attendance in Advisory; get to cafeteria, sit in groups
  • 8:05-9:30 Gingerbread House Competition
  • 9:30-9:45  Break, Change for Sports Day as needed
  • 9:45-11:45  Sports Day
  • 11:45-11:50 Move to Auditorium for assembly
  • 11:50-12:15 MS Assembly in Auditorium

1:30-4 Faculty reception (2nd floor HS – outside art room)

Upcoming (on the radar)

  • Jan. 8 – Work Day (normal hours)
  • Jan. 9 – First day with students for S2
  • Jan. 19 – StuCo Lock In
  • Jan. 25 and 26 – Start of Project X (special schedule)
  • Jan. 29-Feb. 2 – Week of Project X

 

Duties for S2:  I need to work out the S2 duty schedule.  It was built based on the original prep periods – we have tried to have duties adjacent to those free blocks.  As I get set to rebuild it, I want to ask if we would rather move to a single week schedule regardless of whether the duty is adjacent to a prep.  Please complete these quick 1 question survey:  S2 Duty Schedule

Grade and Comment Dates: This information has been on the sidebar all of quarter 2, but I should have also added it to the main blog.  Here are the grading/comments dates for Q2/S1.  As you can see the deadlines are tight – we have pressed the official deadlines back as far as possible rather than set them arbitrarily early.  For this reason, there is no leeway.  All of this (except for the verification) can be done as early as you like.

  • Dec. 14: Comments completed and peer reviewed (in S1 bin) and grades completed by 3:00; verification reports will be printed at 3:00
  • Dec. 15:  Verification reports reviewed, signed (can be digital), and returned to office by 12:15
  • Dec. 15: Reports emailed to parents at 3:00

 

Feedback on Child Safety Guidelines:  Counselors are hoping they can get feedback on the Child Safety Guidelines.  So far they have only received 4 responses.  Please help them out by completing the Child Safety Guidelines Survey

 

New Icons in PowerSchool: In order to include more information about students, there are now a few more icons that may show up by student names in PowerSchool.  These now include:

1.  medical (now there)
2.  a C for counseling (meaning some social emotional sensitive issues
3.  N for new student this year
4.  Binoculars – click it and it will immediately “find” the student and where they are (class etc)
5. Exclamation point:  LS, EAL etc
6. Soccer ball (ahem football) – in season sport

 

S2 Day Rotation:  The HS has created a fix for their SL/HL IB hours issue.  This requires us to swap the rotation on Day 10 to FGHE.  This will start in S2.

 

Tripod Survey Results:  Results from the Tripod Surveys may be shared before break (we are still waiting to receive the reports from the company).  Some faculty members might want to look at the results over break; and others might want to look at them when they return.  There are a few things that will be useful to you for when you decide to review your feedback.  Tripod Reflection Protocol: This is created by Tripod and will be especially helpful for those who have never done a Tripod survey before.  The information is valuable and there is a reflection worksheet you could use.  Here is a shorter reflection form that we used last year (you’ll need to make a copy).  If you want to use this one, I recommend using it in conjunction with the information in the Tripod Reflection Protocol.  Here is the 2016 Divisional Overview.  I will put up the 2017 divisional overview as soon as possible as well.  Regardless of when or how you want to review your feedback, I’d like to schedule a 15-20 minute meeting with each of you to talk about your analysis and reflection on the data.  I am hoping to conduct all of those meetings in January.

 

Project X T-shirts:  To build a sense of whole school community and excitement for Project X, all faculty and staff will get a Project X t-shirt.    This shows the t-shirt design and the sizing chart.  Please self-measure one of your t-shirts (that you feel comfortable when wearing) and compare with the chart below to identify the shirt size that you would like to have. Note that there are different sizes for men & women.

There is one t-shirt per person that will be worn, Thursday, 25 January; Monday, 29 January and Friday, 2 February; giving time to wash in between wearings.
Please order your t-shirt here according to your division.  If you are AS, then order by divisional building.  ES, MSHS, & Tech.  Please indicate M for men and W for women to place your order.  We encourage everyone to get a shirt, but it is optional.  If you don’t want a shirt, please put an X in the last box.
WWW Photos:  You can find the WWW photos in Google Drive (it’s a bit easier to use than the flickr albums).  Thank you David R for making that happen!
Same pics saved and shared in Google Photos: